Successfully executed multiple Independent Power Projects (IPPs) and developed extensive feeder and distribution networks in key urban and rural areas.
Generation · Distribution · Gas · Water
Our projects
Every photograph on this page is a Lobcom site: Ekiti, Calabar, Lagos, Sagamu and Port Harcourt.
10 projects on record. The single-line diagram below powers each one on as you reach it.
Track record
Flagship power and infrastructure projects, executed end to end by COREN-registered engineers.
Proven impact. Unmatched expertise.
Completed major transformer and RMU installations that enhanced power reliability for high-demand sectors.
Delivered comprehensive engineering solutions across mechanical, electrical, industrial, and facility management services.
Achieved consistent recognition from leading Nigerian DisCos, government agencies, and multinational organizations for our innovative and client-focused approaches.
The portfolio, on the line
Drawn as a single-line diagram. Scroll drives current down the bus; each project's breaker closes as it arrives.
Connected capacity0/26MW
Sites energised0/10
01Power Generation
Ekiti IPP Limited
5MW Ekiti Independent Power
- Scope
- Independent power plant and distribution network — electrical installation engineer and distribution network contractor.
- Capacity
- 5MW
- Location
- Ekiti State
- Status
- Completed
02Oil & Gas
HBM
Gas Compression Station — Calabar
- Scope
- Recently commissioned gas compression station for HBM in Calabar, Cross River State.
- Location
- Calabar, Cross River State
- Status
- Completed
03Power Generation
3MW Power Plant
3MW Plant & 8km Distribution Network
- Scope
- 3MW power plant and 8km distribution network with 10 substations.
- Capacity
- 3MW
- Status
- Completed
04Power Generation
Wigwe University
4MW IPP & 11km Underground Network
- Scope
- 4MW independent power project with an 11km underground distribution network and advanced metering — improving power reliability and cutting operating costs through precise energy monitoring.
- Capacity
- 4MW
- Status
- Completed
- 05

Commercial
GTBank
Guarantee Trust Bank, Awolowo, Ikoyi
- Scope
- Power infrastructure and MEP engineering services for a flagship banking hall.
- Location
- Awolowo Road, Ikoyi, Lagos
- Status
- Ongoing
- 06

Power Generation
Uraga Power (Honeywell Group)
6MW Generation — Apapa
- Scope
- Honeywell Group (Uraga Power Solutions) 6MW power generation plant, Apapa.
- Capacity
- 6MW
- Location
- Apapa, Lagos
- Status
- Completed
- 07

Industrial
Firebrand Industries
Firebrand Tomato Factory, Port Harcourt
- Scope
- Earthing protection and lighting installation for the tomato processing factory.
- Location
- Port Harcourt
- Status
- In Progress
- 08

Power Generation
Uraga Power (Honeywell Group)
8MW Generation — Sagamu
- Scope
- Honeywell Group (Uraga Power Solutions) 8MW power generation plant, Sagamu.
- Capacity
- 8MW
- Location
- Sagamu, Ogun State
- Status
- Completed
- 09

Infrastructure
Christ Church Marina
Christ Church Marina, Lagos
- Scope
- Extension of power infrastructure for the historic Marina cathedral.
- Location
- Marina, Lagos
- Status
- Completed
- 10

Real Estate
UPDC
Pinnock Beach Estate, Lekki
- Scope
- Power infrastructure extension at Pinnock Beach Estate, Lekki.
- Location
- Lekki, Lagos
- Status
- Completed
Project portfolio
On site with our teams — generation, distribution, gas and water systems work across Nigeria.
How we plan, build and meter power plants
The engineering and economics behind the plants and networks above, written up by the team that delivered them.
Regulation13 min read
Captive, Embedded or Mini-Grid? Which NERC Licence or Permit Your Facility Needs
Captive permit, embedded licence, mini-grid permit or state licence? A 2026 decision guide for Nigerian facilities generating their own power, with thresholds and documents.
Read article
Power Generation15 min read
How to Build an Independent Power Project (IPP) in Nigeria: Feasibility to Commissioning
A stage-by-stage guide to building an IPP in Nigeria in 2026: load study, fuel, licensing (NERC or state regulator), design, EPC, distribution, metering, commissioning and O&M.
Read article
Regulation12 min read
NERC Net Billing Regulations 2026 Explained for 50kWp–1.5MWp Systems
Everything a Nigerian business needs to know about NERC's Net Billing Regulations 2026: eligibility, the 120% and 30% caps, timelines, meters, export tariff and whether it pays.
Read articleReady to build?
Let's design, build and protect your environment.
We design, build, modify, enhance, maintain and protect the business environment.













